Tag Archives: 4.2.3

uBar 4.2.3

uBar is the Dock replacement. If you’ve never really liked the Dock, or have a soft-spot for the Windows Taskbar, uBar is here to save the day. uBar can be configured as a dock or task bar for macOS.

Features

  • Favourites area (including Show Desktop and Trash)
  • Expands up to 5 rows (by dragging the edge)
  • Application Badges are readable unlike the Dock’s
  • Customizable uBar menu
  • Activity Mode: hold Ctrl key to show Application CPU and Memory usage
  • Group Windows by Application (Always, Never, Automatic)
  • Light or Dark theme
  • Works on OS X 10.11

What’s New:

Version 4.2.3

Fixed:

  • Missing System Preferences panes such as Bluetooth and Sidecar are now included (Reported by Robin Siebler)

Compatibility: macOS 10.14 or later
Homepage https://brawersoftware.com/products/ubar

Screenshots


Name: uBar_4.2.3_Mactorrents.Me.dmg
Size: 9 MB
Files uBar_4.2.3_Mactorrents.Me.dmg[9 MB]


   Download Torrent

USBclean 4.2.3

USBclean quickly and easily removes all those pesky junk and ghost files from your external Windows formatted USB drives. .DS_Store, Thumbs.db, .Spotlight, and trashes files take up precious space, and can cause issues on some devices. Remove them all quickly and easily with USBclean. Configure USBclean the way you want! Remove files by dragging your drive into the handy drop zone, from the system menubar, or by dropping straight onto the dock icon. You can easily configure USBclean to run only from the system menubar and open at login. It’s a snap to auto quit after dropping your drive onto the dock icon. USBclean always ejects your drive after cleaning for your convenience.

USBclean is useful for:

  • cleaning annoying files which don’t play on your media devices.
  • removal of Mac only files (useful when sharing USB drive with a friends PC).
  • removal of Windows only files which take up useful space
  • removing files of any number of (customizable) filetypes. [for instance, to quickly remove all m4a files from an external drive, go to the “File Types” preference-tab and quickly add “m4a” to the extensions field]

Note: Automatic eject is not available for all volume types.

Compatibility: macOS 11.0 or later
Homepage https://sweetpproductions.com

Screenshots


Name: USBclean_4.2.3_Mactorrents.Me.dmg
Size: 5 MB
Files USBclean_4.2.3_Mactorrents.Me.dmg[5 MB]


   Download Torrent

ForkLift 4.2.3

ForkLift is a powerful file manager and ferociously fast FTP client clothed in a clean and versatile UI that offers the combination of absolute simplicity and raw power expected from a well-executed Mac software.

ForkLift will connect to any remote server SFTP, FTP, WebDAV, Amazon S3, Backblaze B2, Google Drive, Rackspace CloudFiles, SMB, AFP and NFS shares on your local network,- pretty much anything you can plug into or hook up to a Mac. ForkLift also carries a complete toolbox for managing your files, including Folder Synchronization, Multi-Rename, Archive handling, Application deleter, editing files over remote connections and many more. All these power features are packaged into a Finder-like, dual-pane interface that delivers superior workflow while remaining absolutely familiar to use, along with Quick Look, Spotlight search and all.

Features

  • Completely rewritten entirely in Swift
  • ForkLift Mini
  • Two-way Sync
  • Preview
  • Quick Open
  • Multi Rename
  • Dark Mode
  • Dual Pane split vertically or horizontally
  • Favorite Sync via Dropbox
  • Dropbox Support
  • Transfer bandwidth throttling
  • Tags Support
  • Disklet
  • Sync Browsing
  • Tabs
  • Search by name, extention, kind, tags, or content
  • Quick Select
  • App Deleter
  • Remote Editing
  • Archive Management
  • Keyboard Control
  • Workspaces
  • FXP Copy
  • Tools
  • Git Support
  • Open in Terminal, iTerm, or Hyper
  • Hidden Files
  • Share
  • Possible to set as default file viewer
  • File Compare with FileMerge, Kaleidoscope, Beyond Compare, and Araxis Merge support
  • Multilingual: English, German, Hungarian, Polish, Russian, and Ukrainian

What’s New:

Version 4.2.3:

  • Release notes were unavailable when this listing was updated.

*** You need to disable the System Integrity Protection (SIP) to perform the selected Application.

Language: Multilangual
Compatibility: macOS 12.0 or later
Homepage https://binarynights.com/

Screenshots


Name: ForkLift_4.2.3_Mactorrents.Me.dmg
Size: 13 MB
Files ForkLift_4.2.3_Mactorrents.Me.dmg[13 MB]


   Download Torrent


   Download Link

EasyGantt Classic 4.2.3

Name: EasyGantt_Classic_4.2.3_Mactorrents.biz.dmg
Size: 15 MB
Files EasyGantt_Classic_4.2.3_Mactorrents.biz.dmg[15 MB]

   Download Torrent
   Link Download

The biggest strength of EasyGantt: simplicity and reliability. You can create Gantt charts without scratching your head. We focus our attention on the features that the majority of project managers actually use. In addition, the generated charts are visually appealing. A picture is worth a thousand words.

Main features

  • Create beautiful Gantt charts in minutes
  • Create tasks and subtasks with multiple options
  • Setup milestones to record major stepping stones
  • Manage and quickly assign resources
  • Create smart dependencies between tasks
  • Compatible with MS Project XML format
  • Quickly share a project in PDF format
  • Display and share reports

Compatibility: macOS 10.12 or later
Homepage https://www.macplanner.com

Screenshots


Boxy SVG 4.2.3

Name: Boxy_SVG_4.2.3_Mactorrents.biz.dmg
Size: 166 MB
Files Boxy_SVG_4.2.3_Mactorrents.biz.dmg[166 MB]

   Download Torrent

Boxy SVG project goal is to create the best SVG editor for non-technical users as well as for professional designers and developers.

SVG is the standard format for storing vector graphics such as icons, banners, charts and illustrations.

CORE FEATURES

  • Clean and intuitive UI heavily inspired by Inkscape, Sketch and Adobe Illustrator
  • Extensive support for on-canvas editing of object geometry, transform, paint and other properties
  • Save to SVG and SVGZ formats, export to PNG, JPG, WebP, PDF and HTML5
  • Open Clip Art Library integration with thousands of free stock vector arts
  • Google Fonts integration with hundreds of free fonts
  • Configurable keyboard shortcuts for over 100 commands
  • Manual guides, smart guides and grid
  • Path operations (unite, intersect, subtract, exclude, close, reverse, etc.)
  • Arrangement operations (align to, rotate, flip, order, group, etc.)

FOR WEB DEVELOPERS

  • Chromium-based rendering engine
  • SVG and CSS code inspector similar to Chrome Dev Tools
  • Clean SVG output that preserves IDs, classes, titles and other metadata
  • SVG sprites editing support

Compatibility: macOS 10.15.0 or later (Apple M1 compatible)
Homepage https://geo.itunes.apple.com/app/id611658502

Screenshots


EdgeView 4.2.3

Name: EdgeView_4.2.3_Mactorrents.biz.dmg
Size: 36 MB
Files EdgeView_4.2.3_Mactorrents.biz.dmg[36 MB]

   Download Torrent

EdgeView 3 is fast image viewer has elegant user interface. EdgeView 3 is developed and designed for modern MacOS. It can open various image files such as JPEG, PNG, TIFF, BMP, and RAW file of DSLR, EPS and PDF, AI(Adobe Illustrator). Can open image files in archive directly without extraction.

User can open files, rename files, delete files from EdgeView’s file browser. Also can access to SMB/AFP/FTP network volume.

User can navigate images quickly by using keyboard shorcut, mouse wheel, trackpad gesture. EdgeVew show EXIF information, play animation GIF/PNG/WebP smoothly. Save last status to history, and restore when reopen file.

EdgeView 3 will be the best choice when viewing and managing image files.

Features

  • Rewrote full code as Swift for improve performance.
  • Support m1 CPU Mac.
  • Has easy UI, can control main function at Sidebar.
  • Support English/Korean/Japanese/Chinese(Simplified).

Image Viewer

  • Supporting image files such as JPG, GIF, BMP, PSD, TIFF, RAW, WEBP and PDF, EPS, AI(Adobe Illustrator), OpenEXR, HDR, TGA.
  • Can play animation GIF/PNG/WebP. User can control animation with floating animation controller.
  • Dispaly internal image(or frame) of animation GIF/PNG/WebP or HEIC that has multiple internal image.
  • Can read and show images of major archive formats (such as ZIP, RAR, CBZ, CBR, 7-zip) without extraction. Of course, can open ZIP file that 4GB over.
  • Can read encrypted archive file.
  • Can read archive file in archive file recursively
  • Improved draw speed by rebuilt image cache system and drawing engine.
  • Draw images as high quality.
  • Provide suitable functions for comic reading such as ‘Two-Page Spread’, ‘Continuous Scroll mode’, ‘Right to Left’, etc.
  • Provide multiple navigation functions like as ‘Move’, ‘Skip’, ‘Shift’, etc.
  • User can navigate images and check whole thumbnails at Thumbnailsbar.
  • User can navigate images by using keyboard shortcut, mouse wheel, trackpad gesture.
  • Can rotate and flip images. Orientation will be saved to history.
  • User can select part of images, and copy it or save as file.
  • Can zoom in/out image freely.
  • Built-in loupe function to make it easier to magnify part of image.
  • Show histogram.
  • Show neighbor files list. And can open neighbor file.
  • Support history feature for saving and restoring last status of file.
  • Can reopen file or remove history at history list.
  • Can rate image files.

File Browser

  • Built-in file browser can show and open files from local drive or AFP/SMB/FTP network drive.
  • Can display files as lists or icon.
  • Show images in folder/archive file at preview panel.
  • Generate thumbnails of archive files and folders.
  • Support powerful search feature.
  • Show category and writer information.
  • User can sort files by various options, and can delete or rename files.
  • Can rate files or folders.

Others

  • Support customizing feature. Also user can change shortcuts.
  • Built-in Quick Look Extension generate thumbnails and preview of archive files at Finder.

Compatibility: macOS 11.1 or later • Apple Silicon or Intel Core processor
Homepage https://apps.apple.com/pk/app/edgeview-2/id1206246482

Screenshots


Magic Battery Mini 4.2.3

Magic Battery Mini supports all Apple and Logitech peripherals. Battery information will be shown in a small window or in the Notification Center widget.

Magic Battery Mini shows the battery level of supported input devices that are connected via Bluetooth.

The following devices are supported (if your device is not listed, please contact the support)

Input devices
• Apple Magic Mouse
• Apple Magic Mouse 2
• Apple Magic Trackpad 2
• Apple Wireless Keyboard
• Apple Wireless Trackpad
• Logitech mice like the MX Anywhere 3
• Logitech keyboards like the K380

The app features
• Displays battery information for connected Bluetooth devices in a lightweight window.
• This app comes with a widget that integrates into the notification center.
• Connected or disconnected devices are detected automatically. The view is then adjusted accordingly.

Compatibility: macOS 11.5 or later • Apple Silicon or Intel Core processor
Mac App STore https://apps.apple.com/app/magic-battery-mini/id1366903902

Screenshots


Name: Magic_Battery_Mini_4.2.3_MAS__HCiSO_Mactorrents.is.dmg
Size: 5.41 MB
Files Magic_Battery_Mini_4.2.3_MAS__HCiSO_ Mactorrents.is.dmg[5.41 MB]

   Download Torrent
   Download Links